I am sorry I don't know if I have expressed clearly,if anyone can give help, welcome to ask in detail.<br><br>On Monday, 18 March 2013 10:37:06 UTC+8, sally wrote:<blockquote class="gmail_quote" style="margin: 0;margin-left: 0.8ex;border-left: 1px #ccc solid;padding-left: 1ex;">Dear everyone,<div> I have encountered a problem made me confused for quite a long time. Here is the story: I need to design a slide where I have one picture displayed which is a 9-points evaluation picture. I put another red pillar to move from 1-9, I made this by iteratatively call this slide using some code of course, with a label. The puzzle is that there is time difference between two procedure, one is to run whole program without entering any button which result in no iterative call, no pillar moves, another is to move the pillar as much as possible during the time limit. the difference is about 1-2s. I have to fix this up as I need to synchronize the eprime program and fmri. I think this discrepancy is due to different call times. I hope I can account this time delay into the display time, but I don't know what kind of time log can discribe this delay </div></blockquote>
<p></p>
-- <br />
You received this message because you are subscribed to the Google Groups "E-Prime" group.<br />
To unsubscribe from this group and stop receiving emails from it, send an email to e-prime+unsubscribe@googlegroups.com.<br />
To post to this group, send email to e-prime@googlegroups.com.<br />
To view this discussion on the web visit <a href="https://groups.google.com/d/msg/e-prime/-/B_LPB2vWzCcJ">https://groups.google.com/d/msg/e-prime/-/B_LPB2vWzCcJ</a>.<br />
For more options, visit <a href="https://groups.google.com/groups/opt_out">https://groups.google.com/groups/opt_out</a>.<br />
<br />
<br />