Hello all,<br><br>So I have 6 tasks in my experiment each is it's own procedure and corresponding list. I then have a master list one level up which makes the 6 tasks go in random order. The problem is that I do not want any of the tasks to be performed back to back. Is there a way to do this? Can I tell e-prime to run those 6 blocks randomly, but not have it repeat the same one twice?<br><br>Thanks!!<br><br>-Matt<br>
<p></p>
-- <br />
You received this message because you are subscribed to the Google Groups "E-Prime" group.<br />
To unsubscribe from this group and stop receiving emails from it, send an email to e-prime+unsubscribe@googlegroups.com.<br />
To post to this group, send email to e-prime@googlegroups.com.<br />
To view this discussion on the web visit <a href="https://groups.google.com/d/msgid/e-prime/d5f76a17-de33-4ed1-becf-cbe39986cecb%40googlegroups.com">https://groups.google.com/d/msgid/e-prime/d5f76a17-de33-4ed1-becf-cbe39986cecb%40googlegroups.com</a>.<br />
For more options, visit <a href="https://groups.google.com/groups/opt_out">https://groups.google.com/groups/opt_out</a>.<br />
<br />
<br />