E-prime time collection

Paul Gr pauls_postbus at hotmail.com
Mon Dec 5 16:35:20 UTC 2005


Hi Jeff,

You can change the weight of a level by using the SetWeight routine before 
running the list.
Don't forget to call the Reset routine of the list after any such 
modification.

best
Paul




>From: Jeff Maxwell <maxwell.jeff at gmail.com>
>Reply-To: jsmaxwell at wisc.edu
>To: eprime at mail.talkbank.org
>Subject: Re: E-prime time collection
>Date: Mon, 5 Dec 2005 09:03:22 -0600
>
>Hi All,
>In most List_object columns one can dynamically assign/update values
>(e.g., read in an attribute).  But I'm having trouble getting this to
>work with the Weight column.  Is there a way to do this?
>
>If not, I can use a loop in the procedure with a scripted
>counter/conditional set, but then I would need to log each loop
>through the procedure as a formal trial in the resulting .edat file
>(i.e. as if each time through the loop had been initiated in the list
>object) -- and I am unsure the most effective way to do this.  Ideas?
>
>Thanks much,
>Jeff Maxwell
>
>
>--
>Jeffrey S. Maxwell
>Laboratory for Brain Imaging & Behavior
>Laboratory for Affective Neuroscience
>jsmaxwell at wisc.edu
>(608) 263 3672
>http://brainimaging.waisman.wisc.edu/~maxwell/
>



More information about the Eprime mailing list